  Project Overview

 
 

Fort McMurray Firebag #3 & #4

This cogan facility consisted of pre engineered structural prefabricated liner system, metal building insulation, Z bars and 24 gage exterior skin. The roof was constructed in the same fashion using a standing seam roof.

 
  • Fort McMurray, Alberta
  • Manufacturer – Behlen Industries
  • Foot print – 80,000 sq ft 60’ eave
  • Special information – 40 ton overhead crane, camp facilities
 